
JMA co-led a track and embankment stabilization project for BART to prepare final design plans for 9 at-grade locations, providing long term mitigation. JMA utilized articulated concrete blocks for protecting the slopes and designed the drainage system for collecting stormwater runoff on the slopes and directing them to the local stormwater system.