JMA is currently designing the track work and new platforms at the proposed Ceres and Ripon Stations, including 3.4 and 1.1 miles of new UPRR mainline extensions, respectively. JMA is upgrading the industrial track connections, new second mains, existing grade crossing and a new layover track supporting the mainline expansion.
Phone: 925.400.4356
OAKLAND
383 4th St. Ste. 201
Oakland, CA 94607