JMA led the redesign of the existing A-1 parking lot at Site 200. The design included improvements to traffic flow and overall user experience. In addition, the work included conceptual evaluation of improvements to B-4 parking lot and the design was completed September 2017.
Phone: 925.400.4356
OAKLAND
383 4th St. Ste. 201
Oakland, CA 94607