![](https://o6z1e7.a2cdn1.secureserver.net/wp-content/uploads/2017/07/Campus_Roadway6_LBNLLawrenceRoad-845x321.jpg)
JMA led the redesign of the existing A-1 parking lot at Site 200. The design included improvements to traffic flow and overall user experience. In addition, the work included conceptual evaluation of improvements to B-4 parking lot and the design was completed September 2017.